ehoandClaude Opus 5 12f17d9d73 docs: archive the finished backlogs (RD-30)
Two backlog trees are complete: `docs/project/backlog/` (75 files, every
WP done) and `docs/project/refactor-backlog-setup/` (the arc before it).
Move both under `docs/project/archive/` with `git mv`, so history stays
intact through `git log --follow`. `SHOWCASE-ROADMAP.md` moves with them,
because it points at the now-archived backlog README.

Add `docs/project/archive/README.md`. It states that these trees are
historical and names the two directories that are still live.

Repoint every inbound reference named in RD-30's Files table: CLAUDE.md,
the root README, both backend READMEs, `LetterHtml.cs`, `a11y.mdx`, the
`document-feature` and `new-ssp` skills, and the readable-codebase PLAN,
README, and RD-19 ticket. Fix two upward-relative links inside the moved
WP files (WP-68, WP-69) that gained a directory level and would otherwise
break. Repoint `.prettierignore`'s two agent-prompt exclusions to their
new path, so prettier keeps leaving those files' exact wording alone.

Mark RD-30 done and check off its acceptance criteria; flip its README
row to done.

Co-Authored-By: Claude Opus 5 <noreply@anthropic.com>
2026-09-08 23:00:38 +02:00

36 lines
1.5 KiB
Markdown
Raw Permalink Blame History

This file contains ambiguous Unicode characters
This file contains Unicode characters that might be confused with other characters. If you think that this is intentional, you can safely ignore this warning. Use the Escape button to reveal them.
MODEL: Opus
OUTPUT FILE: /refactor-backlog/99-backlog.md
DEPENDS ON: 01-readability.md through 07-bio2-compliance.md (all complete)
---
[Insert contents of _persistence-protocol.md here — file-level: re-run only if a
Phase 1 file changed since last run]
ROLE: Consolidation & CD-Sequencing Agent
Input: all Phase 1 files (01–07) + 00-baseline.md.
1. Deduplicate overlapping findings across agents — merge into one ticket, list all
contributing reasons/agents.
2. Score priority:
P1 = violates a correct ADR, blocks testability, or is a BIO2 compliance risk.
P2 = significant maintainability cost, moderate effort.
P3 = low urgency.
3. Sequence for continuous delivery: every ticket must be independently deployable
without a big-bang release. Reject/split any ticket that can't ship alone —
decompose into a dependency chain of smaller tickets.
4. Any ticket touched by the BIO2 agent requires compliance sign-off before merge,
regardless of priority score — mark explicitly.
5. Output final table:
| ID | Module | Category | Description | Baseline metric improved | Effort (S/M/L) |
Risk | Priority | CD batch # | Depends on | Status |
6. Separately list "ADR-fix" tickets — require human/architect approval before any
dependent code ticket proceeds.
HALT CONDITION: after writing 99-backlog.md, stop and report to the human for
approval before any Implementation Agent (Phase 3) starts — even if no tickets
carry a compliance or ADR-fix flag.