Commit Graph

4 Commits

Author SHA1 Message Date
566fc9bcea feat(event-subscriber): enrich the projection with the zaak reference via the ACL (refs #78)
On each notification the subscriber reads the zaak's reference (identificatie)
through the ACL — the only code allowed to talk to ZGW (§8.1) — and persists it on
the register_projection row and in the processed_notifications replay log. Storing
it in the log keeps rebuild log-only (ADR-0008): no ACL/ZGW access on rebuild.

Co-Authored-By: Claude Opus 4.8 (1M context) <noreply@anthropic.com>
2026-07-14 14:46:48 +02:00
1c185e6686 S-09b: Approval flow — temp admin endpoint + status transition to projection (#77)
All checks were successful
CI / lint (push) Successful in 1m25s
CI / build (push) Successful in 1m13s
CI / unit (push) Successful in 1m26s
CI / frontend (push) Successful in 2m35s
CI / mutation (push) Successful in 6m6s
CI / verify-stack (push) Successful in 7m34s
## What & why

S-09b (#75, split from #10) — the **approval flow** that completes the walking skeleton. A behandelaar can now approve a submitted registration; the entry flips from `INGEDIEND` to `INGESCHREVEN` in the public register. Flow: `POST /registrations/{id}/approve` (domain) → ACL sets the zaak eindstatus (ZGW `/statussen`) → OpenZaak → NRC → event-subscriber → projection → openbaar.

## Changes (bottom-up, each red→green TDD)

- **Domain** — `RegistrationStatus.Ingeschreven` + `Registration.Approve()` (guards: opened zaak, only from INGEDIEND); `ApproveRegistration` use case (idempotent) + temp `POST /registrations/{id}/approve` endpoint; `IAclClient.ApproveZaakAsync`.
- **ACL** — resolves the zaaktype's **eindstatus** from the catalogus (`isEindstatus` / highest volgnummer) and POSTs a ZGW status; exposed as `POST /statussen`. Unit + real-OpenZaak integration test.
- **Event-subscriber** — binds NRC `hoofdObject`, projects a `status`/`create` as `INGESCHREVEN` keyed on the zaak (updates the existing row), **without reading OpenZaak** (§8.1). Retains the ZGW `resource` in the log (new column + EF migration) so a rebuild reproduces the status.
- **e2e** — extended: submit → public INGEDIEND → approve → public INGESCHREVEN.
- **Docs** — ADR-0011 (the two non-obvious decisions + the walking-skeleton assumption) + demo note.

## Key decisions (see ADR-0011)

- **ACL discovers the eindstatus** (chosen over injecting a statustype URL): no new config/seed plumbing, domain stays ZGW-ignorant.
- **Any post-creation status-set ⇒ INGESCHREVEN**: in the walking skeleton the only status ever set after creation is the approval, and the subscriber may not read ZGW — documented to tighten when more transitions arrive (S-12+).

## Verification

- All .NET unit suites green locally (domain 47, acl 11, event-subscriber 14, bff 16, acceptance 7); Release build + `dotnet format` clean.
- No new compose config (the eindstatus-discovery approach avoided it).
- The real-OpenZaak integration test (ACL status-set) and the full submit→approve→visible e2e run in CI `verify-stack` (live NRC→projection + selectielijst egress, not reproducible locally).

closes #75

Reviewed-on: #77
2026-07-14 09:04:57 +00:00
017cd5e66b feat(event-subscriber): project zaak-created notifications into the read projection (refs #7)
Implement NotificationProjector: a zaken/zaak/create notification records the delivery
in the notification log (atomic record-or-skip for idempotency, §8.6) and upserts an
INGEDIEND projection row keyed by zaak id; other channels/actions are ignored. Rebuild
clears the projection and replays the log — no OpenZaak access needed (§8.1). bsn/naam
are deferred (ADR-0008).

Co-Authored-By: Claude Opus 4.8 (1M context) <noreply@anthropic.com>
2026-06-30 14:48:08 +02:00
c70840e5b7 test(event-subscriber): project zaak-created notifications into the read projection (refs #7)
Failing unit + acceptance tests for the Event Subscriber's NotificationProjector:
a zaken/zaak/create notification yields one INGEDIEND projection row, duplicate
deliveries collapse to one row, non-zaak/non-create notifications are ignored, and
a rebuild repopulates the projection from the durable notification log (PRD §8.4).

The projector is a no-op stub so the tests compile and fail on the assertions; the
implementation follows in the green commit. The notification log doubles as the
idempotency guard and rebuild source so a rebuild needs no OpenZaak access (§8.1).

Co-Authored-By: Claude Opus 4.8 (1M context) <noreply@anthropic.com>
2026-06-30 14:47:16 +02:00