Runs the multi-agent refactoring-backlog pipeline in docs/project/ refactor-backlog-setup/ up to and including three of the seven Phase 1 agents. 00-baseline.md establishes the metrics every later agent must cite, using only tooling already in the repo (vitest lcov, coverlet cobertura, ESLint's core `complexity` rule at threshold 0 for a full distribution, depcruise --metrics). Duplication and C# complexity had no tooling, so tools/baseline-scan.mjs adds a deterministic ~200-line text scan rather than a new dependency; the approximations are labelled as such. Headline: FE 75.1% line coverage but only over the 98 of 220 source files a spec loads; BE 97.6% line / 79.6% branch; 0 layering violations; 7.1% duplication; 25 of 2085 TS functions over CC 10. Then 02-testability, 04-cqrs-light and 06-adr-conformance (27 findings). 01/03/05 were skipped deliberately — the baseline shows little for them to find; 07 (BIO2) and 08 (consolidation) are still open. Each agent corrected a baseline observation of mine, and in every case the error was in something derived rather than measured: - BL-007 counted ~13 adapter "mutations" from the `runSubmit` helper name; 5 of those call sites are reads. It also missed 3 real mutations that reach the raw ApiClient and never return a Result. - BL-002 diagnosed the 100%-duplicated auth folders as ADR-0002's divergence prediction failing. It never had a chance to fail: §3's `Principal` union was never built. - BL-004 named libs/shared/domain and libs/beheer/contracts as coverage gaps; both are pure type declarations where 0% is unimprovable. All three corrections are recorded inline in 00-baseline.md §10, so agent 08 does not inherit the bad numbers. .prettierignore excludes the agent prompt directories — reflowing their markdown would edit the prompt text itself. Co-Authored-By: Claude Opus 5 <noreply@anthropic.com>
2.4 KiB
MODEL: Opus OUTPUT FILE: /refactor-backlog/99-backlog.md DEPENDS ON: 01-readability.md through 07-bio2-compliance.md (all complete)
PERSISTENCE & RESUME PROTOCOL
Before starting work:
- Read /refactor-backlog/_status.md. If your row says "complete", stop — do not re-run.
- If "in_progress", read your own output file. Treat modules already listed as done. Resume from "Last module processed" + 1.
- If "not_started", confirm your dependencies show "complete" in _status.md. If not, stop and report a blocking dependency instead of guessing.
While working: 4. Append findings incrementally, one module at a time. After each module, update _status.md: "Last module processed" and "Last updated". 5. Each finding gets a stable ID (e.g. RD-014) that never changes across runs. 6. If interrupted, the file + status row is the full recovery state.
On completion: 7. Mark your _status.md row "complete" only once every module in scope has a corresponding section in your output file.
Every output file starts with:
Scope: [modules covered]
Status: [not_started | in_progress | complete]
Last updated: [timestamp]
Depends on: [file(s)]
---
Phase 1 file changed since last run]
ROLE: Consolidation & CD-Sequencing Agent
Input: all Phase 1 files (01–07) + 00-baseline.md.
- Deduplicate overlapping findings across agents — merge into one ticket, list all contributing reasons/agents.
- Score priority: P1 = violates a correct ADR, blocks testability, or is a BIO2 compliance risk. P2 = significant maintainability cost, moderate effort. P3 = low urgency.
- Sequence for continuous delivery: every ticket must be independently deployable without a big-bang release. Reject/split any ticket that can't ship alone — decompose into a dependency chain of smaller tickets.
- Any ticket touched by the BIO2 agent requires compliance sign-off before merge, regardless of priority score — mark explicitly.
- Output final table:
| ID | Module | Category | Description | Baseline metric improved | Effort (S/M/L) | Risk | Priority | CD batch # | Depends on | Status |
- Separately list "ADR-fix" tickets — require human/architect approval before any dependent code ticket proceeds.
HALT CONDITION: after writing 99-backlog.md, stop and report to the human for approval before any Implementation Agent (Phase 3) starts — even if no tickets carry a compliance or ADR-fix flag.